Skip to main content Scroll Top
22km Power Distribution Network, Lagos – Design & Build

Project Type: Power Distribution Infrastructure
Network Length: 22 Kilometers
Location: Lagos State, Nigeria
Scope of Work: Design and Construction

TIS Renewable Energy Limited successfully delivered the design and construction of a 22km power distribution network in Lagos State. The project involved detailed network planning, route optimization, and installation of medium- and low-voltage distribution infrastructure to improve power availability and system reliability.

The scope included line routing, pole and cable installation, transformer integration, and system testing. The project enhanced grid resilience, reduced transmission losses, and provided stable electricity supply to residential, commercial, and industrial consumers within the serviced areas.